Successful outcomes
98.7%521 completed in available sources · 7 reported failures
Conversation sessions
486Observer coverage unavailable
Scheduled runs
52Attributed to managed routines
Estimated model cost
$284.16Scheduled-work subtotal only

Published budget coverage

Budget bars appear only for versioned limits stored in the control plane.

Published token budget7.4M of 12M
Published scheduled-work cost budget$284.16 of $480

Per-run and monthly limits shown below are versioned control-plane settings. This view does not claim an automatic pause unless the runtime reports it.

Observed scheduled-work models

This is not a complete account model breakdown.

Gemini 3.7 Flash5.3M tokens
$228.8272% of tokens
GPT-5.6 Sol1.5M tokens
$39.0420% of tokens
NVIDIA Nemotron 3 Ultra593.6K tokens
$16.308% of tokens

Usage by capability

Only scheduled runs with a deterministic owner capability appear here. Conversation usage is not guessed.

Estimate preparation218 successful outcomes
Estimate preparation token share41%
Tokens
3M
Cost
$126.42
Production follow-up144 successful outcomes
Production follow-up token share25%
Tokens
1.8M
Cost
$74.18
Job-cost review87 successful outcomes
Job-cost review token share20%
Tokens
1.5M
Cost
$49.72
Warranty routing72 successful outcomes
Warranty routing token share14%
Tokens
1M
Cost
$33.84

Scheduled-work budgets

Each routine has its own model, timeout, per-run ceiling, and monthly guardrail.

Ridge

Open estimate review

Active

12 estimates reviewed · 3 need a decision

Monthly budget$12.84 of $30.00
Gemini 3.7 Flash$1.20 per-run ceiling
Ridge

Weekly job-cost check

Active

28 jobs checked · 2 material variances

Monthly budget$8.16 of $20.00
Gemini 3.7 Flash$2.00 per-run ceiling
Ridge

Stalled production follow-up

Active

6 projects reviewed · 4 follow-ups prepared

Monthly budget$9.42 of $24.00